£270,000 Earmarked For Inverclyde Footway Improvements

24 February, 2021 | Local

PAVEMENTS on 15 Inverclyde streets are set to be repaired at a cost of nearly £270,000.

The programme of upgrades has been drawn up by council officials.

Some of the footways had been scheduled for resurfacing in the past 12 months but work couldn’t happen because of the covid pandemic.

It’s hoped work can take place on the programme in the 12 months from the start of April.

Full proposed programme

A770 Cloch Road, Gourock (Dunvegan Avenue to Faulds Park, north side)

Dunrobin Drive, Gourock (Full length)

Tantallon Avenue, Gourock (DOune Gardens to Taymouth Drive)

Tower Drive, Gourock (no.58 to no.70, at shops)

Brisbane Street, Greenock (Fox Street to Margaret Street, south side)

Castle Road, Greenock (Full length)

Fox Street, Greenock (Ardgowan Street to Finnart Street, east side)

Glen Douglas Road, Greenock (Selected lengths)

Glen Fruin Road, Greenock (Selected lengths)

Glen Street, Greenock (Fox Street to Johnston Street)

Regent Street, Greenock (Lynedoch Street to Roxburgh Street, south side)

Wren Road, Greenock (Mavis Road to shops, east side)

Gryffe Road, Kilmacolm (Houston Road to Bridge of Weir Road, selected sections)

B786 Lochwinnoch Road, Kilmacolm (Knockbuckle Road to Castlehill Road)

Alderbrae Road, Port Glasgow (Alderwood Crescent to no.24, north side)

Pin It on Pinterest